Bespoke Hardwood timber Footbridge - Ref 4072
The client required a replica bridge of the original Ladies Bridge built in 1922 but it needed to be designed to current codes and standards. As the bridge is in a tidal location, CTS identified tide times to determine the installation sequence and to ascertain how much could be undertaken on site each day. The isntallation was completed in two weeks. The bridge is manufactured using Ekki which is a naturally durable timber and is ideal for coastal locations.
Dimensions
52m O/a comprising 7 spans x 1.5m wide
Client
Aberdeenshire Council
Location
Ladies Bridge, Cruden Bay, Aberdeenshire